Design and startup of new compute/storage infrastructure for large stainless steel production line – based on multiple HPE servers and thin clients 
– as well as Dell storage and workstations.  Project included re-design of key workloads along with proper workload distribution.  Also designed and implemented new Factory Floor based Active Directory (AD) domain – complete with users, groups, OUs, GPOs (to control user environment), sites, subnets and logon scripts 
– and printer management.  Instituted 
HMI UI paradigm shift from thick client architecture to Remote Desktop Services (RDS)/Terminal services.  Custom utilities/automation tools were created to help ensure conversion accuracy and speed.
	- 3-million-dollar project with unprecedented startup speed and success – with minimal production disruption  
- Significant reduction of TCO with overall new architecture design
- Customer estimated 2 million dollars project savings